HISTORICAL REPORTS

Aquifer Modeling
and
Characterization
Year


Title
  

 Authors /Collaborators
Recipient
 Purpose               
 1982Water Resources of Borrego Valley and Vicinity, California:  Phase 1 – Definition of Geologic and Hydrologic Characteristics of Basin  U. S. Geological SurveySan Diego CountyAssess the extent of data necessary to create a groundwater model
  1983 Preliminary Evaluation of Annual Recharge to the Borrego Valley Ground Water Basin    California Department of Water ResourcesSan Diego CountyPresent results of study of groundwater recharge to the aquifer             
  1983A Preliminary Evaluation of Historical and Projected Water Demand for Borrego ValleyCalifornia Department of Water ResourcesSan Diego CountyPresent results of a study of demand, past, and future
  1987Water Resources of Borrego Valley and Vicinity, San Diego County, California:  Phase II – Development of a Ground-Water Flow Model U. S. Geological SurveySan Diego CountyDescribe computer model for groundwater flow in Borrego Valley aquifer
  1993Letters to San Diego County SupervisorsSan Diego State University Dept. of Geological SciencesSan Diego County Board of SupervisorsReview of aquifer data after community concerns about golf course expansion
  19963-D Geophysical Studies of the Upper Borrego Valley:  Final ReportAgbabian and AssociatesKajima Engineering and Construction Mapping depth to groundwater and depth of aquifer’s basement
  2001Water Resources of Borrego Valley, San Diego County, CaliforniaSteven P. Netto,  San Diego State UniversityBorrego Valley Growers CommitteeMaster’s thesis on the development of a groundwater flow model; includes information on water budgets
  2005Final Report on Monitoring Wells – Phase 1Borrego Water DistrictCalifornia Department of Water ResourcesFinal grant report for the monitoring project phase
  2007Final Report on Monitoring Wells – Phase 2Borrego Water DistrictCalifornia Department of Water ResourcesFinal grant report for the monitoring project phase
Groundwater Management Planning
Year

Title
 Authors / Collaborators
 Recipient Purpose
  1968Interim Report:  Inland Basins Project, Borrego Valley, California, Reconnaissance InvestigationsU.S. Bureau of ReclamationU.S. Bureau of ReclamationInventory of land and water use, present development, and future needs as directed by USBR  mandate; includes water quality survey
  1972Inland Basins Projects – California and Nevada Summary Report: Reconnaissance InvestigationsU.S. Bureau of ReclamationU.S. Bureau of ReclamationInventory of  potential  for USBR projects; includes water quality survey
  1984Borrego Valley Water Management PlanCalifornia Department of Water ResourcesSan Diego CountyProvide information for the county that could affect the prosperity of Borrego Springs
  2001Groundwater Management Study:  Report of the Technical CommitteeBorrego Water District Technical CommitteeBorrego Water District Policy CommitteePresent findings of completed studies on aquifer use and recharge; project future use/recharge; outline alternatives
  2002Groundwater Management PlanBorrego Water Districtn/aReport on groundwater use and recharge trends and guideline for action
  2007Draft Report:  Expert Panel for Developing a Hydrogeological Investigation Program for the Borrego Valley Groundwater BasinWilliam R. Mills, P.E.Borrego Water DistrictReport of workshop proceedings and suggested action items
  2009

Integrated Water Resources Management Plan

William R. Mills, P.E.Borrego Water DistrictUpdate to status of groundwater overdraft and mitigation of it; present management alternatives
  2010Anza-Borrego Desert Regional  Water Management Work PlanBorrego Water District,San Diego County, Resource Conservation District of San Diego Countyn/aDraft material for grant application to California Department of Water Resources for funding of integrated water management
  2010Anza-Borrego Desert Integrated Regional Water ManagementBorrego Water District,San Diego County, Resource Conservation District of San Diego CountyCalifornia Department of Water ResourcesGrant application for funding of integrated water management (not funded)
  2011Anza-Borrego Desert Integrated Regional Water Management:  Facilitation and Technical Support Feasibility AssessmentCenter for Collaborative Policy at Cal State SacramentoBorrego Water District and collaboratorsAnalysis of potential stakeholder cooperation and process in support of future regional management grant applications
  2012Borrego Springs Pipeline Feasibility Study:  Final ReportU.S. Environmental Protection AgencyBorrego Water DistrictAssess and project costs and benefits of water sources to augment local supply from aquifer
  2013Water Sustainability and Climate – Category 2:  Toward Water Sustainability in an Extreme ClimateTravis E. Huxman, University of California, IrvineNational Science FoundationProposal to evaluate integrated water infrastructure  using participatory science framework
 2013Anza-Borrego Desert Integrated Regional Water Management MapMDA Federal Inc.Borrego Water DistrictAerial map with outlines of management entities
 Water Quality
 YearTitle
 Author Recipient Purpose
 2014

STATUS OF GROUNDWATER QUALITY IN THE BORREGO VALLEY, CENTRAL DESERT, AND LOW-USE BASINS OF THE MOJAVE AND SONORAN DESERTS STUDY UNIT, 2008–2010: CALIFORNIA GAMA PRIORITY BASIN PROJECT

USGS  
 1968Interim Report:  Inland Basins Project, Borrego Valley, California, Reconnaissance InvestigationsU.S. Bureau of ReclamationU. S. Bureau of ReclamationInventory of land and water use, present development, and future needs as directed by USBR  mandate; includes water